|
Last Modified: 11-29-2007 |
1.6 A |
|
Service Category: Engine/Hybrid System |
Section: Cooling |
|
Model Year: 2008 |
Model: Sequoia |
Doc ID: RM000002BMS00BX |
|
Title: 2UZ-FE COOLING: WATER PUMP: INSTALLATION (2008 Sequoia) |
INSTALLATION
1. INSTALL WATER PUMP ASSEMBLY
|
(a) Install a new O-ring to the water by-pass pipe.
|
(b) Apply soapy water to the O-ring.
(c) Connect the water pump to the water by-pass pipe end.
(d) Temporarily install the water pump and a new gasket with the 5 bolts, 2 stud bolts and nut. Uniformly tighten the bolts, stud bolts and nut in several passes.
Torque: 21 N·m (214 kgf·cm, 16 ft·lbf)
Torque: 18 N·m (183 kgf·cm, 13 ft·lbf)
2. INSTALL INLET WATER HOUSING
|
(a) Apply seal packing in a continuous line to the places shown in the illustration.
Seal packing:
Toyota Genuine Seal Packing Black, Three Bond 1215B or equivalent
Standard seal diameter:
2.0 to 3.0 mm (0.0787 to 0.118 in.)
NOTICE:
-
Remove any oil from the contact surface.
-
Install the water pump within 3 minutes after applying seal packing.
|
(b) Apply soapy water to a new O-ring and install it to the water inlet housing.
|
(c) Temporarily install the water inlet housing with the 2 bolts. Uniformly tighten the bolts in several steps.
Torque: 18 N·m (184 kgf·cm, 13 ft·lbf)
Bolt Length:
|
Item
|
Length
|
|
Bolt A
|
77 mm (3.03 in.)
|
|
Bolt B
|
22 mm (0.866 in.)
|
|
(d) Connect the water by-pass hose to the water inlet housing.
3. INSTALL TIMING BELT
(a) Remove the timing belt
.
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 N·m (55 kgf·cm, 48 in·lbf)
NOTICE:
When disconnecting the cable, some system need to be initialized after the cable is reconnected
.
5. ADD ENGINE COOLANT
6. INSPECT FOR COOLANT LEAK
7. INSTALL NO. 1 ENGINE UNDER COVER
|